Professional & Technical Services AZ DOL H-1B

Critical Path Institute: H-1B Sponsorship Profile

Critical Path Institute in AZ (Professional & Technical Services) is dominated by DOL H-1B labor-condition applications (3 on file) at a $116,515 disclosed median; OSHA and WARN tracks are empty here.

Verify with OSHA → · BLS OEWS →
Subscribe to WARN notice updates (RSS)
Critical Path Institute workforce trust profile One rising office-tower pillar encoding federal-records percentiles for the tracks this employer carries. Critical Path Institute Federal records · signal DOL H-1B 255075100 68 signal Hiring 3 filings
Higher = stronger signal vs. peers (live corpus percentile 0–100 per axis present on this profile). Source: DOL OFLC.

Critical Path Institute (AZ): · 3 H-1B LCAs at a $116,515 disclosed median

According to DOL OFLC H-1B disclosures, OSHA ITA injury logs, and state WARN Act notices, Critical Path Institute in AZ carries 3 H-1B wage filings on record, a $116,515 median wage (below the $124,488 national median) and no WARN layoff notices on file. Every figure is a federal filing, not an estimate; see methodology for coverage limits.

  • 3 H-1B LCAs
  • $116,515 median wage

The record at a glance

Compared with the rest of PlainEmployers' federal employer corpus, H-1B filing volume ranks #12,546 of 51,370 sponsors in this corpus (about the 68th percentile), and disclosed median wage sits at the 44th percentile of 272,125 credible H-1B wage rows.

68th pct
H-1B filing rank
44th pct
median wage rank
14%
cleaner WARN history than

Figures above come from DOL H-1B labor condition applications only, OSHA and WARN tracks are empty on this profile.

F
Federal workforce composite
38/100
3 of 4 federal tracks · Critical Path Institute

A weighted composite of DOL H-1B sponsorship and pay, OSHA establishment injury records, and WARN Act layoff notices, not culture, benefits, or "is this a good place to work." Missing tracks drop out and their weight redistributes so sparse records are not silently deflated.

Sponsorship scale B-
3 H-1B LCAs
#12,546 of 51,370 sponsors · 68th percentile by volume (DOL OFLC)
Disclosed pay D
$116,515 median
44th percentile of 272,125 credible H-1B wage rows
Workplace safety N/A
No OSHA record
No employer-specific OSHA ITA injury log; weight redistributes (industry estimates never pad this dim).
Layoff stability F
0 WARN notices
Cleaner WARN history than 14% of 304,376 tracked employers (state workforce agencies)

Weights (redistributed when a track is N/A): Sponsorship scale (H-1B volume) 15% · Disclosed pay (H-1B wage percentile) 25% · Workplace safety (OSHA DART percentile) 35% · Layoff stability (WARN percentile) 25%. Sources: DOL OFLC · OSHA ITA · state WARN filings.

H-1B Filings

3

Established sponsor. DOL labor condition applications on file.

Median H-1B Salary

$116,515

Near national median. Across 3 disclosed positions

Where Critical Path Institute's H-1B wage sits nationally

Median disclosed wage vs. all US employers with H-1B filings

$116,515 Top 56% higher than 44% of 272,125 US employers

$0–$20,000: 1 US employers (0%). Below this entry. $20,000–$40,000: 401 US employers (0%). Below this entry. $40,000–$60,000: 7,591 US employers (3%). Below this entry. $60,000–$80,000: 24,066 US employers (9%). Below this entry. $80,000–$100,000: 43,829 US employers (16%). Below this entry. $100,000–$120,000: 49,740 US employers (18%). This entry sits in this band. $120,000–$140,000: 42,626 US employers (16%). Above this entry. $140,000–$160,000: 33,306 US employers (12%). Above this entry. $160,000–$180,000: 22,983 US employers (8%). Above this entry. $180,000–$200,000: 15,711 US employers (6%). Above this entry. $200,000–$220,000: 10,825 US employers (4%). Above this entry. $220,000–$240,000: 6,806 US employers (3%). Above this entry. $240,000–$260,000: 4,579 US employers (2%). Above this entry. $260,000–$280,000: 2,975 US employers (1%). Above this entry. $280,000–$300,000: 1,671 US employers (1%). Above this entry. $300,000–$320,000: 5,015 US employers (2%). Above this entry. Critical Path Institute $0 $320,000 every US employer with H-1B filings, bucketed by value

Each bar is a $20K-wide band; taller bars hold more US employers. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count, share, and where it sits relative to this entry.

Source DOL Office of Foreign Labor Certification, H-1B Disclosure Data · August 2026

Government Data Summary

Field Value Source
Employer Name Critical Path Institute DOL OFLC
Industry Professional & Technical Services NAICS / DOL
State AZ U.S. Federal Records
H-1B Filings 3 DOL OFLC LCA Disclosure
H-1B Median Salary $116,515 DOL OFLC LCA Disclosure
Tracks not on file employer OSHA injury log, WARN notices Empty by design, not estimated

Critical Path Institute's values above reflect the most recent DOL Labor Condition Applications on file for this employer in AZ (Professional & Technical Services). In this corpus, H-1B filing volume ranks #12,546 of 51,370 sponsors in this corpus (about the 68th percentile); disclosed median wage sits at the 44th percentile of 272,125 credible H-1B wage rows; WARN history is cleaner than 14% of 304,376 employers tracked here.

H-1B Salary Data

Job Title Median
Quantitative Medicine Scientist $123,902
Senior Data Analyst $116,515
Quantitative Medicine Developer $78,038

What the Data Says About Critical Path Institute

Signature stat: WARN history

Even with zero WARN notices, Critical Path Institute still sits in the bottom third for layoff cleanliness — other employers have equally quiet records.

Heavy H-1B sponsor

Critical Path Institute in AZ (Professional & Technical Services) filed 3 H-1B labor condition applications at a $116,515 disclosed median — a top-tercile sponsorship footprint in this corpus.

No OSHA record despite scale

Critical Path Institute sponsors 3 H-1B positions but carries no employer OSHA DART rate here — at this filing volume the gap usually reflects recordkeeping exemptions, not a verified safety judgment.

Typical disclosed pay

A $116,515 disclosed median lands near the middle of the wage distribution (44th percentile vs $124,488 nationally).

How Critical Path Institute compares to Professional & Technical Services peers

Critical Path Institute's nearest H-1B-filing peers in Professional & Technical Services (home state AZ). Each card links to that employer's federal-records profile.

This employer

Professional & Technical Services · AZ

Critical Path Institute

3 H-1B filings
Median H-1B
$116,515
OSHA grade
-
WARN notices
0

Professional & Technical Services · CA

Google LLC

5,397 H-1B filings
Median H-1B
$193,915
OSHA grade
-
WARN notices
37

What to check before working with Critical Path Institute

For Critical Path Institute, start with sponsorship pay (3 H-1B LCAs, median $116,515) and only then layer any other federal silence.

  • H-1B median is $116,515 across 3 disclosed-wage positions (of 3 total filings), benchmark any offer against it and the metro prevailing wage. Compare with peers

Critical Path Institute's figures are legally filed public records (DOL, OSHA, state WARN), not reviews or vendor estimates; a missing row is not proof the underlying activity never happened.

Read with this employer

Retrieved and formatted by PlainEmployers.

Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from OSHA and the DOL Wage and Hour Division. Consult a qualified professional before making decisions based on this data.

Frequently Asked Questions

Where does Critical Path Institute's H-1B wage sit nationally?

Among 272,125 credible H-1B wage rows in this corpus, Critical Path Institute's disclosed median of $116,515 sits at the 44th percentile (below the $124,488 national median). The chart above uses a COUNT-exact percentile (rows below this wage ÷ total), not an interpolated estimate.

How does Critical Path Institute's H-1B filing volume compare to other sponsors?

Critical Path Institute has 3 H-1B filings on record, ranking #12,546 of 51,370 sponsors in this corpus (about the 68th percentile by volume). Filing volume is a sponsorship signal, not a headcount or hiring-quality score.

Related guides: How OSHA safety grades are calculated · Using H-1B wage filings in salary negotiation

This profile is rendered directly from DOL H-1B disclosure filings, no number is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of August 2026.